NW&E has delivered a large portfolio of successful and award-winning projects in KSA and the Gulf Region, both as an independent company and as a part of strategic partnerships and consortiums. Our project highlights include:

Water Transmission Facilities for East Hidd and South Bahrain Contract EPC2

Client name

Electricity and Water Authority

Project value

134 Million and 369 Thouthands and 3 Hunbreds SAR

Started date

2021

Project Type

Old Awarded & Completed Construction Projects

Completion date

2023

Scope of work

  • This project is construction of water distribution station Construction of ground storage tank with all associated fittings with the overall tank capacity of 50,000 m3 The station is equipped with pumps, chlorination system, surge system and all related infrastructure works associated with in the station The station is fully automated equipped with SCADA, HVAC, Firefighting system etc... the station also consist of Guard House, Chlorine Building & Electrical Building A new Break Pressure Tanks has to be constructed along the existing main line Refurbishment of Al Dur pumping station, where in all the pumps will be replaced and the existing piping inside the room.

TABUK STP & PUMPING STATION OPERATION & MAINTENANCE

Client name

Ministry of Environment, Water and Agriculture - MEWA

Project value

24 Million and 700 Thouthands SAR

Started date

2020

Project Type

O&M Projects

Scope of work

  • Operation & Maintenance of Tabuk Sewage treatment plant
  • Avg. flow 90,000 m3/day (Peak Flow 153,000 m3/day)
  • Main pumping station and transmission line manpower over 110 personnel
  • Duration - 36 month

Al-Zayde Water Network Construction

Client name

National Water Company

Project value

98 Million and 779 Thouthands and 6 Hunbreds SAR

Started date

2019

Project Type

Old Awarded & Completed Construction Projects

Completion date

2023

Scope of work

  • 2 Carbon Steel Tanks Total Capacity: 50,000 m3 Civil work: Excavation & Backfilling 190,000 m3 Pipe Work: HDPE 110mm – 200mm : 135,000 m DI 250mm – 700mm: 24,000 m Total length: 159,000 m Valves: 868 no. Chlorination building Guard House Asphalting: 15,000 m2. Existing services relocation

Operation & Reactive Maintenance Services of Utilities in KAEC

Client name

KING ABDULLAH ECONOMIC CITY

Project value

16 Million and 200 Thouthands SAR

Started date

2019

Project Type

O&M Projects

Scope of work

  • Operation & Preventive Maintenance covering an area of more than 173 km including: 1- 15 operational pumping station 2- 200 no unit substation 3- 150 Km LV & MV cables 4- 100 km potable & irrigation network 5- 20 km storm & sewage network